1.PHASES OF POOL CONSTRUCTION

Two phases:

1. Preparatory phase - excavation and concreting of floor slabs.

2. The installation of the pool itself consists of the phase of forming the pool walls, lining them, installation as well as connections, and installation of the filter substation in the machine room of certain dimensions.

2. PRINCIPLE AND CONTRACTING PROCESS

The process where during the initial meeting we are informed about the requirements and possibilities. Then we instruct the client in the way of work, products, and services we offer. After that, an informative offer is made so that the client can make a financial construction for cooperation.

You can schedule the initial meeting via the link in the period from 9 am to 1 pm every day in our showroom.

3. POOL MAINTENANCE

After the construction of the pool, the hygiene of the water and the pool itself is maintained. This is greatly influenced by the weather conditions and thus the costs of hygiene products and time for cleaning.

There are automatics for water maintenance or the client decides on our service for pool maintenance on a seasonal level. Of course, by our standards after building the pool each client receives the necessary maintenance training.

4. CLOSING THE POOL AT THE END OF THE SEASON

Pools from our range are very easy to preserve and prepare for winter. It's necessary to:

-Empty the pool to the level below the skimmer

-Drain the water from the installation

-treat water with chemistry

-cover the pool with a winter "blanket"

Such a closed pool is a safe freezing id, and the client from the subsequent costs of emptying / filling the pool.

5. OPENING THE POOL AT THE BEGINNING OF THE SEASON

After a properly preserved pool with the first rays of the sun, it is necessary to discover the pool, check the installation, refill the pool, test the water and treat it with chemicals.

6. HOW TO POSITION THE POOL IN THE YARD

A properly positioned pool is one that provides the user with comfortable use and movement from all sides of the base. In order to comply with this, the pool should be at least 0.5m away from the first barrier (wall, passage, path…) and up to 10m away from the room for the machine part.

7. SWIMMING POOL ON STEEP TERRAIN.

When building on terrains that have a "slope", it is necessary to determine the starting point, ie the height of the wall, and concerning it to form the shape of the pool following the requirements of the client and the terrain.

The styrofoam technology we use for swimming pools enables this option and guarantees the safety of the pool, whether it is on slippery terrain, mountains, pools by rivers, or in residential buildings.

8. POOL ON THE BUILDING

As we mentioned no special technique is required for this except to do STATICS BEFORE building a pool on the roof so that the slab can withstand the load of the pool and more importantly-water.